Sale!

Stainless Works M152H3ORLG 2015-2020 Mustang GT 2” Headers Off-Road (Long Lead System connects to SW, Corsa, and MBRP catbacks)

Original price was: $1,347.97.Current price is: $227.25.

SKU: kxdhmwgc78021 Category: Tag:

Description

Details
Improve the performance on your 2015-2020 Mustang GT with this 2” long tube header from Stainless Works. This long tube headers system was designed specifically to improve airflow on forced induction coyote motors.
These headers features ⅜” thick flanges, mandrel bent primaries and 3” slip fit collectors. This system is built from corrosion resistant 304 stainless steel and TIG welded at our state of the art facility in Streetsboro, Ohio. As always we stand by our products with a lifetime warranty on material and craftsmanship.
Features
• Designed Specifically For Forced Induction Motors
• Aftermarket Connect For A Full 3” Exhaust To Most Catbacks
• Includes Off-Road Leads
• 2” Mandrel Bent Primary Tubes
• 3” Slip Fit Collectors
• Excellent Fitment For Easy Installation
• 304 Stainless Steel
• TIG Welded For Beauty And Strength• Lifetime Warranty On Materials And Craftsmanship
Choose Your Connection
Stainless Works Mustang GT 2018 systems come in Factory Connect configuration.
Factory Connect allows our headers or exhaust to connect to the factory exhaust or manifolds respectively. They connect to the factory location on either end or can connect to each other for a full Stainless Works system.
Performance Connect is designed to take advantage of performance gains not possible with the standard factory connection point. Both SW headers and SW exhaust are used in this configuration. In the case of the G8, we’ve developed a system which uses an X-pipe to create a true-dual system which doesn’t neck-down.
Aftermarket Connections Another option to make your ride uniquely yours, Stainless Works is offering a new configuration for Mustang Headers: Aftermarket Connections. With this version of headers with extended leads, you can connect to a handful of catbacks for your ride. SW Factory Connect, MBRP, and Corsa catbacks can all link up with this new “Unholy Union” option, available now!
Stainless Works performance systems now available for the new 2018 Mustang GT. Gain roaring sound and increase flow with these sick catbacks and powerful headers.
Innovative Design
We take our years of experience, and inject that knowledge into creating performance systems that maximize horsepower, torque and sound. Each system is designed for the specific vehicle with distinct features to get the most performance possible along with great fitment.
Solid Construction
Made to withstand grueling engine conditions, Stainless Works exhaust and downpipes are fabricated from 304 stainless steel, which not only resist corrosion, but is more durable than its aluminized steel or 409 stainless steel counterparts.
Features:
‣ 304 stainless steel construction
‣ TIG welded for strength
‣ Mandrel bent (no buckling) for optimal flow
‣ Designed and Made in Streetsboro, Ohio, USA
Increased Power
Factory manifolds can be restrictive and hold back the true potential of your ride. Stainless Works’ systems unlock the power of your engine. Our long tube, free-flowing design reduces back pressure, and will bring new found power that you can feel and hear.
Limited Lifetime Warranty
Stainless Works headers and exhausts are designed to take the punishment of your motor, and are backed by a Limited Lifetime Guarantee on material and workmanship.
Install-Ready
We want to make sure installation goes as smoothly as possible, that’s why Stainless Works systems come Install-Ready.
Whether clamps, O2 extensions, bolts or RTV silicone, our headers and exhausts come with all necessary accessories to make installation as smooth as possible.

Reviews

There are no reviews yet.

Be the first to review “Stainless Works M152H3ORLG 2015-2020 Mustang GT 2” Headers Off-Road (Long Lead System connects to SW, Corsa, and MBRP catbacks)”

Your email address will not be published. Required fields are marked *